Location:Home >Equipments>Excellent Project
Wen-Fu Railway Baima River Mega Bridge
Source: Author: Createdate:2011-04-09 Hits:1395  Font:【 【Print】

Baima River Mega Bridge is a railway mega bridge on the newly built Wen-Fu Railway line (Fujian Section), measuring 3126.96m in length as the double line railway bridge, and the distance between two lines is 4.67m~4.60m and the bridge is 13m in width. It was officially open to traffic in December 2009. It won the New Record Prize of the Chinese Enterprises in 2009.

Share to:
0
  | |  
上一篇:Foshan Pingsheng Bridge
下一篇:Yantai Terminal Engineering Project of ZCHI Shipbuilding Co., Ltd
Contact Us:No.582, Jingang Avenue, Nansha District, Guangzhou City, China. Tel: +86-020-61996691/6692
Copyright © China National Nuclear Corporation. All Rights Reserved.