Location:Home >Equipments>Excellent Project
Nan-Kun Railway Key Engineering Project Banqi No. 2 Bridge
Source: Author: Createdate:2011-04-20 Hits:1429  Font:【 【Print】
Banqi No. 2 Bridge is the key project of Nan-Kun Railway as the first plain curve railway bridge in the world, highly reputed as “Flower of China Railway Bridge Science and Technology”. In 1997 it was rated as the model engineering project of Nan-Kun Railway by the Ministry of Railways. In 1998 it was presented with the titles of Bureau-level Excellent Engineering Project and Excellent Quality Model Engineering Project by CSCEC.
Share to:
0
  | |  
上一篇:Kunming Guannan Interchange
下一篇:Foshan Pingsheng Bridge
Contact Us:No.582, Jingang Avenue, Nansha District, Guangzhou City, China. Tel: +86-020-61996691/6692
Copyright © China National Nuclear Corporation. All Rights Reserved.