Location:Home >Equipments>Excellent Project
Xi’an Third Ring Bahe River Mega Bridge
Source: Author: Createdate:2011-04-20 Hits:1441  Font:【 【Print】
Xi’an Third Ring Bahe River Mega Bridge is the key control project of Third Ring Road and the landscape project of Xi’an City, measuring 961m, composed of 6 bridges. The main bridge adopts 5 cross-sink steel pipe concrete tied arch beam structure and the main bridge and auxiliary bridge adopts the continuous precast box girders, so it is the largest bridge of the identical category in northwest of China. It got started for construction in June 2005 and was open to traffic on January 27, 2007. It won Xi’an City Municipal Engineering Project Golden Prize and the Excellent Engineering Project Prize from the Group Company in 2007. It was awarded the won Locomotive Engine Excellent Quality Engineering Project First Prize and National “Municipal Golden Cup Demonstration Project”.
Share to:
0
  | |  
上一篇:Xi’an- Nanjing Railway Xiniu Valley Mega Bridge
下一篇:Kunming Guannan Interchange
Contact Us:No.582, Jingang Avenue, Nansha District, Guangzhou City, China. Tel: +86-020-61996691/6692
Copyright © China National Nuclear Corporation. All Rights Reserved.